WNA Globe

World News by Wild Rose

#infrastructure damage ×

Kooriyad NH 66 stretch opens after reconstruction

Around 200 metres of the under-construction highway had caved in on May 19, 2025, after the eight-metre embankment gave way under rainwater pressure