Residents raise fresh concerns over the alleged violation of mandatory distance norms separating the 110 kV EHT line passing through their neighbourhood from the twin towers. They allege that the construction has put lives and properties at risk
Residents have been protesting the persistent leakage since 78 families moved into the apartments built by GCDA in January 2024
Mostly fish, meat, and chicken vendors have shifted to makeshift shacks outside the market after being asked to vacate over a month ago on the assurance that they will be reinstated before monsoon
Residents have been protesting against the persistent leakage since 78 families moved in in January 2024. They have also raised concerns about cracks and an alleged tilt in the buildings
Shortly after 2026 Assembly elections were notified, Advocate General issued a legal opinion advising that GCDA proceed with land pooling only after issuing a notification bringing two panchayats โ Kunnathunadu and Kizhakkambalam โ under its ambit. GCDA had identified nearly 300 acres in these panchayats for third-phase expansion of Infopark
The dispute resurfaced when the GCDA undertook construction of a compound wall as part of strengthening stadium security, which the college challenged in court